EWEB II – 42” Riverfront Water Main Extension
Owner: Eugene Water & Electric
Contract Value: $3.7 Million
Engineer: Chris Irvin P.E. (EWEB)
The 42” Riverfront Transmission Main Extension is a continuation of phase I constructed by our teams. This includes 2,800LF of 42” poly coated/cement lined welded steel and associated appurtenances along the Willamette River. In addition, TSC open-cut a portion of this alignment under the RR trestle and installed 8” DI through an existing casing to the University of Oregon for future water supply.