EWEB II – 42” Riverfront Water Main Extension

Owner: Eugene Water & Electric 

Contract Value: $3.7 Million

Engineer: Chris Irvin P.E. (EWEB)

The 42” Riverfront Transmission Main Extension is a continuation of phase I constructed by our teams.   This includes 2,800LF of 42” poly coated/cement lined welded steel and associated appurtenances along the Willamette River.  In addition, TSC open-cut a portion of this alignment under the RR trestle and installed 8” DI through an existing casing to the University of Oregon for future water supply.


All Rights Reserved.

Exit mobile version