Hobson Reservoir #2

Owner: City of Sublimity

Engineer: 4B Engineering, Inc.

Contract Value: $1,450,000.00

The City of Sublimity is making improvements and seismic upgrades to their existing water system by building a brand-new 0.75-million-gallon bolted steel reservoir that will serve the local community for many years to come. Located at their current Hobson Reservoir site, all work consists of site work grading, structural foundation preparation and concrete foundation, reservoir tank supply and erection, reservoir piping, testing, and disinfection, site restoration including existing tank demolition, and cleanup.