Water Treatment Plant Replacement
Owner: London Water Cooperative
Contract Value: $1,148,515.00
Engineer: RH2
TSC Project Team: Chris Dunmire, Project Manager. Chris Berhorst, Foreman
Year: 2025-2026
Contract Amount: $424,400.00
TThis project involves the installation of a new owner-provided package water treatment plant designed to improve system efficiency and meet current water quality standards. The work includes the placement of two new 10,000-gallon water storage tanks complete with associated yard piping, valves, fencing, and telemetry. Site work includes the installation of a new electrical service, access road grading, site development, and yard piping integrated with the existing system.
The completed facility will provide enhanced water treatment capacity, improved reliability, and storage necessary to support future system needs.